Skip to main content

NIC 42202

Electrical & Civil EPC

Design, engineering, procurement, supply, erection, testing and commissioning — delivered as a single turnkey package, with the associated civil works in the same contract rather than subcontracted out.

Voltage range
415 V – 220 kV
Documented value
₹38.62 crore
Projects on record
23

Our EPC services

Power Substation Installation

Turnkey 33/11 kV substations up to 2×5 MVA — design, supply, erection, testing and commissioning, including all associated civil works.

11 kV – 220 kV

HT & LT Transmission Lines

Erection and stringing of 11 kV, 33 kV and EHV overhead lines on rail, tubular and PSC poles, from survey through to charging.

11 kV – 220 kV

Rural Electrification

Distribution networks under R/E and A.D.P. schemes — 33/11 kV substations, distribution substations, LT networks and service connections.

415 V – 33 kV

Utility Shifting & Road Widening

Relocation of electrical and water infrastructure clear of highway alignments — for NHAI, state utilities and EPC principals.

415 V – 33 kV

Street Lighting

Supply, erection and civil works for campus, industrial-yard and public street lighting installations.

Civil Construction

Substation buildings, warehouses, administrative blocks, dormitories, foundations, piling and roads — delivered alongside the electrical scope.

Transformer O&M and Annual Maintenance

Transformer health assessment, overhaul and rehabilitation, protective relay replacement, and annual maintenance contracts for HT and LT systems.

415 V – 220 kV

Electrical Pole Supply

Supply of rail, tubular and PSC poles for transmission, distribution and lighting applications across Jharkhand.

Why it matters

One contractor, both disciplines

Ranisons is registered for electrical and civil construction and operates its own plant fleet. On our substation packages the foundations were set to equipment we were ourselves installing — which removes the interface risk that normally sits between the two trades.

Excavation to handover

The civil scope, inside the same contract

  1. Excavation

    Footprint set out and stringed, column positions marked, and pits taken down to formation level.

  2. Substructure

    Footings and pedestals cast, plinth beams tying the grid together, and the floor slab laid.

  3. Superstructure

    Columns erected and plumbed, portal rafters seated at the ridge, purlins and eaves rails run.

  4. Envelope

    Sheeted, roofed and made weathertight, shutters hung, and the internal lighting and services energised.

Have a tender or a drawing set?

Send it across and we'll come back with a scope, a programme and a budget.