Dismantling, re-erection and shifting of combined 11 kV HT and LT distribution lines under the Ranchi circle.

Contract value
₹1.68 crore
Work order
470/PR/JSEB/2012-13 (W.O. 15)
Location
Ranchi, Jharkhand

One of two adjacent JSEB packages awarded in December 2012 for the dismantling, re-erection and shifting of combined 11 kV HT and LT distribution lines in the Ranchi circle. A second package under the same reference covered a further ₹69.52 lakh of works.

Live-network shifting requires the work to be sequenced around approved shutdowns and restored to supply the same day wherever possible.

More like this

Related projects

Other contracts drawing on the same disciplines.

A low-tension distribution pole carrying a fan of service drops over a hillside town
EPC principal

Electrical Utility Shifting, Mecon Roundabout Flyover

Larsen & Toubro Limited

Electrical utility works for L&T's Mecon Roundabout Flyover in Ranchi, certified complete by the project manager with quality recorded as good.

Contract value
₹7.14 cr
Work order reference
LE/LE22M630/WOD/23/000043
Pole-mounted distribution transformer with HT and LT connections against a clear sky
Government

Utility Shifting along NH-33, Ghatshila

Jharkhand State Electricity Board

Turnkey shifting of electrical infrastructure along the NH-33 corridor under the Ghatshila electric supply sub-division.

Contract value
₹3.34 cr
Work order reference
RS/RAN/W.O/ELE/01/13-14
A transmission switchyard of lattice gantries seen across open ground
PSU / UtilityIn progress

11 kV Feeder Diversion, Amalgamated Joyrampur Colliery

Bharat Coking Coal Limited (Lodna Area)

Diversion of five 11 kV colliery feeders clear of an overburden dump at Patch-D, awarded by BCCL through the Coal India e-tendering portal.

Contract value
₹1.74 cr
Work order reference
PO 5700516127