Drinking Water Pipeline and Handpump Shifting, NH-75

Relocation of drinking water pipelines and handpumps clear of the NH-75 alignment.

Contract value
₹31.58 lakh
Work order
KRAM/NH75/LOI/005
Location
NH-75 corridor, Jharkhand

Relocation of drinking water pipelines and handpumps clear of the NH-75 alignment — utility shifting outside the electrical trades, and evidence that our corridor work covers the full range of services a highway package encounters.

More like this

Related projects

Other contracts drawing on the same disciplines.

A low-tension distribution pole carrying a fan of service drops over a hillside town
EPC principal

Electrical Utility Shifting, Mecon Roundabout Flyover

Larsen & Toubro Limited

Electrical utility works for L&T's Mecon Roundabout Flyover in Ranchi, certified complete by the project manager with quality recorded as good.

Contract value
₹7.14 cr
Work order reference
LE/LE22M630/WOD/23/000043
Pole-mounted distribution transformer with HT and LT connections against a clear sky
Government

Utility Shifting along NH-33, Ghatshila

Jharkhand State Electricity Board

Turnkey shifting of electrical infrastructure along the NH-33 corridor under the Ghatshila electric supply sub-division.

Contract value
₹3.34 cr
Work order reference
RS/RAN/W.O/ELE/01/13-14
A transmission switchyard of lattice gantries seen across open ground
PSU / UtilityIn progress

11 kV Feeder Diversion, Amalgamated Joyrampur Colliery

Bharat Coking Coal Limited (Lodna Area)

Diversion of five 11 kV colliery feeders clear of an overburden dump at Patch-D, awarded by BCCL through the Coal India e-tendering portal.

Contract value
₹1.74 cr
Work order reference
PO 5700516127

Planning something similar?

Send us the tender or the drawings. We will come back with a scope, a programme and a budget — and the completion certificates to back it.